You are here

Story Archive

Primary tabs

Category Titlesort descending Date Excerpt Attached Images
ARIEL Workshop
Headlines ARIEL-CANREB team celebrates first-round commissioning of High Resolution Separator and ARIEL B2 beamlines 20 November 2019 The project team working on the Advanced Rare Isotope Laboratory (ARIEL) is pleased to announce that several beam delivery components for CANREB (the CANadian Rare isotope facility with Electron Beam ion source) recently underwent successful first-round commissioning.
Current Events ARIEL: All Cables Connected for E-linac! 16 September 2014 August 29th marked the final push for cable pulling efforts for ARIEL’s e-linac. Over 1,400 cables have been gathered, pulled, and connected from the e-hall roof and are ready to power and control the accelerator!
Current Events ARIEL: Beam Line Installed in Tunnel 24 September 2014 With astonishing speed, the E-Linac beam line was installed in the ARIEL tunnel. A key synergy between three offices on site, the Design Office, the Machine Shop, and the Beam Lines Group, resulted in a precise, accurate, and speedy installation.
Experimental Result ARIEL: Switching on the (RF) Power 12 September 2014 With the mass efforts building in the Electron Hall this year, many components of the e-linac are in position and ready for operation. Klystron One and Klystron Two, the high-power continuous wave klystrons, are ready to power the cryomodules of the e-linac.
Aris Chatzichristos
Arnab Banerjee
Aron Nootebos
Current Events ARPICO is 'On the Neutron Trail' 15 April 2011 The Society of Italian Researchers and Professionals in Western Canada held their inaugural event featuring Olivia Fermi, beginning their mission to build connections across Canada and with Italy.
Arrow

Pages

Subscribe to Recent Stories