You are here

2.3 Excavation complete: 1970

May 1970: Aerial view of the completed excavation for the cyclotron, service annex and experimental halls. The Main Office Building is at the upper right.

The light roofed shack at top centre houses the de-watering system pumps. The piping to the numerous well points can be seen snaking around the perimeter of the excavation.